KAPHİB’den Haberler

ÜYELERİMİZDEN

PERİSSİA OTELİ

PERİSSİA OTELİ

millstone cave suites

millstone cave suites

FLORIA HOTEL

FLORIA HOTEL

KARLIK EVİ OTEL

KARLIK EVİ OTEL

MİRAS OTEL

MİRAS OTEL

Kemal's Guest House

Kemal's Guest House

ELIT CAVE SUITES

ELIT CAVE SUITES

Temenni Evi

Temenni Evi

OTEL KRAL

OTEL KRAL

GAMİRASU CAVE HOTEL

GAMİRASU CAVE HOTEL

GÖREME KAYA OTEL

GÖREME KAYA OTEL

ÖZBEK CAVE STONE HOUSE

ÖZBEK CAVE STONE HOUSE

GÖREME CITY HOTEL

GÖREME CITY HOTEL

MİRACLE CAVE HOTEL

MİRACLE CAVE HOTEL

HELİKE İN CAPPADOCİA

HELİKE İN CAPPADOCİA

YUNAK EVLERİ

YUNAK EVLERİ

CAPPADOCİA CAVE SUIT

CAPPADOCİA CAVE SUIT

Agarta Cave Hotel

Agarta Cave Hotel

DOORS OF CAPADOCİA

DOORS OF CAPADOCİA

TURİST HOTEL CAPPADOCİA

TURİST HOTEL CAPPADOCİA

KAP-HİB Facebook

Projects

KOZAKLI GEOTHERMAL WATER DISTRIBUTION PIPELINE PROJECT

PROJECT OBJECTIVE: To ensure the sustainability of the tourism Kozakli geothermal resources preservation and pave the way for new investment.

PROJECT PURPOSE: Kozaklı Thermal Tourism Center made via a central line of the water distribution and reinjection of geothermal water to avoid waste and that the new investors are not able to open areas provide an opportunity to supply geothermal water wells.

ACTIVITY 1 - Special Provincial Administration of production well number 6 or remove, turn the well one reinjection, the water obtained from six wells up to make the distribution networks and heating the water used to make Drainage network for the Reejeksyo.

ACTIVITY 2 - to create a business system following the project's completion.

PROJECT COST: £ 200.00 This birliğimiz of 7540 to implement the project file renovated in 2014 Cultures and financial assistance related to the remaining allowances from the Tourism Ministry has been requested to provide.

THE WORK DONE:

1- One Piece hot water well was drilled. (2013)

2. Drainage line, and ETL been completed. (2013)

3- 2.Reenjeksiyo the well was drilled. (2014)

4- Kozakli geothermal water distribution line project began auctions work. (2014)

 

 

 

 

CAPPADOCIA TOURIST ROADS MAINTENANCE AND REPAIR PROJECT

PROJECT OBJECTIVE: The General Directorate of Highways in the improvement of tourist path way removed from the network Cappadocia region.

PROJECT PURPOSE: to ensure easier access by raising the standards of road maintenance and repair work on the tourist itineraries also also is intended to be healthier than traffic safety.

PROJECT COST: £ 040.00 This birliğimiz of 5490 to implement the project file renovated in 2014 Cultures and financial assistance related to the remaining allowances from the Tourism Ministry has been requested to provide.

THE WORK DONE:

1 Goreme, Uchisar, Avanos, Urgup ways Patch and coating works

2- dy.ilt Uchisar, Uçhisar- Göreme, Avanos, Göreme, Cavusin interchange arrangement, dy.ilt-Urgup-Goreme and Ortahisar Pavement work protocol was made by the Provincial Special Administration.

 

 

 

 

 

Ibrahimpasa SEWER PROJECT

PROJECT OBJECTIVE: The improvement of the protection of human health and the environment by sewage flowing openly in the valley.

PROJECT OBJECTIVE: It was aimed to improve the hiking trails in the valley as the preferred sewerage system which will be both visually and valleys to eliminate the disturbing situation in terms of health tourism.

PROJECT COST: £ 668,917.62. (For 2011)

CURRENT SITUATION: In this project the implementation of the ministry of tourism in the year 2013 500 000,00 TL appropriation provided £ edilmiştir.131.100,00 Special Provincial Administration of the tender met the tender was £ 631,100.00 has been Completion in 2014.

 

 

 

 

AVANOS-URGUP VALLEY ROAD PROJECT BETWEEN Derventa

PROJECT OBJECTIVE: one of the region's most important tourism centers of Urgup and Avanos route ars way of raising standards in contributing to the development of tourism.

PROJECT AIMS: Tourist and regions heavily used by people to reduce the road at the same time the region's major tourist destination with Zelve Open Air Museum and Devrent valley due to its location on the route of raising the standard of this road traffic and make safe and comfortable way traffic in transit.

PROJECT COST: £ 5,128,007

CURRENT SITUATION: $ 50,000 grant request was sent to the path of edilmiştir.bakanlık £ 5,128,007 to provide financial aid for this route. But the PDP-PRU Union Council of Tourism Region roads maintenance, sent in 2013 1.000.000 TL appropriation for the construction of the road in accordance with the decision used for this road construction is completed in 2014. In addition, about $ 50,000 grant from the provincial Ministry of Tourism Administrations are carried out with the protocol for making guardrails.

 

 

 

 

AVANOS-Özkonak-lumpy ROAD PROJECT

PROJECT OBJECTIVE: Self mansion where the underground city and Kozakli to contribute to the development of tourism by facilitating access to thermal tourism center ..

PROJECT PURPOSE: Our .İli as well as the shortest road route 5 in terms of transportation district kozaklı district. The Kozakli tourists coming to Cappadocia integrating thermal tourism and Kozakli aimed to develop thermal tourism.

PROJECT COST: £ 4,493,727.41. (For 2011)

CURRENT SITUATION: The implementation of this project in 2012, the ministry of tourism 3,000. 000,00 TL appropriation provided edilmiştir.2013 years in the business Nevşehir Provincial Administration commissioned the protocol to work karalaştırılarak başlanmıştır.il administrations to 3 vesting provisions of £ 1,922,715.00 paid, the remaining amount to 1,077,285 4. And finally vesting, £ 00 paid and the road was completed and opened in 2014

 

 

 

 

CLEAN-VALLEY PARTNERSHIP ARRANGEMENTS AND ARCHAEOLOGICAL PROJECT of TEO

In this project, the areas under study.

1- Gülşehir Açıksaray -Roof valley cleaning and regulatory affairs.

2- Ayvali village Çağlak valley, and cleaning and regulatory affairs of the stirrup Gomeda Valley.

3- SOBESOS ancient city and the Forty Martyrs monastery Cleaning and regulatory affairs.

4- Cemil village Keşlik Monastery Cleaning and regulatory affairs.

5- Mustafapaşa Aya Nikola Monastery and beydere valley cleaning and regulatory affairs.

6- Cavusin, Zelve and Derbent valley Pasabaglari Cleaning and regulatory affairs.

7 Goreme open-air museum and valleys (Zea, Love valley ... etc) Cleaning and regulatory affairs.

8- Ortahisar Khalaj Monastery, Red and valleys Cleaning and regulatory affairs.

9- Cevizlibağ Uchisar and Pigeon Valley Clean and regulatory affairs.

10 Mustafapaşa Golgol the ruins Cleaning and regulatory affairs.

 

 

 

 

CHURCHES WORK CLEANING

(Former)

 

(Next Hali)

 

 

 

 

Environmental Cleaning Work

 

 

 

 

Roadside Cleaning

 

 

 

 

Valley Cleaning Work

 

 

 

 

 

Valley Stream Gateways and Regulatory Studies

 

 

 

 

 

 

2014 YEAR PROMOTION AND OPERATIONS OF FAIR

                                       

30 JANUARY - 02 FEBRUARY 2014 ISTANBUL FAIR EMIT

30 JANUARY 02 FEBRUARY 2014 dates between TÜYAP Convention and Exhibition Center held EMİTT East Mediterranean International Tourism and Travel Fair Cappadocia Tourism Area Infrastructure Services Association (PDP-PRU) in the organization of 200 m2 area of ​​Urgup, Goreme, Gülşehir, Ortahisar, Uchisar, CCJE to , PDP-TID and KOZTEB our region, including municipalities, tourism representatives, to promote our Cappadocia with Participation of institutions and was conducted in an efficient and effective manner.

 

 

 

 

 

04-07 DECEMBER 2014 Travel Turkey Izmir Fair

04-07 DECEMBER 2014 dates between Izmir Fair Center organized Travel Turkey Izmir Fair Cappadocia tourism Area Infrastructure Services Association (PDP-PRU) in the organization in the area of ​​50 m2 in Goreme, Gülşehir, Ortahisar, Uchisar, of our municipality, including tourism representatives, institutions and the introduction of our Cappadocia region with the establishment of participation is made effective and efficient manner.

 

 

 

 

 

12-18 NOVEMBER 2014 CHINA-HONG KONG AND SHANGHAI FAIR

KAP-HIB Cappadocia Tourism Infrastructure Service Association and Turkish Airlines Nevsehir Sales Manager cooperation, November 12 - November 18, 2014 between serving in the Cappadocia region with the participation of tourism industry representatives, Shanghai - Hong Kong Fam Tripetkinlig; CITM-CHINA-Shanghai International Tourism participated in the exhibition; In addition, China's Shanghai city and the promotion of Cappadocia in Hong Kong and ambassador with the aim of increasing tourism potential, trade and tourism consultants meetings, tourism industry representatives face to face workshops (B2B), cocktails and visit the various industry representatives have been made.

 

 

 

 

RESULT:

Cappadocia Tourism Area Infrastructure Services Association; by joint action with tourism industry representatives, infrastructure within the possibilities for the development of the District Tourism Promotion, Environment and has done important work related to protection activities and to never escape the waste of spending that we have made are intended to provide the maximum benefit by spending the least possible and implemented. In the coming period will also continue to work to make larger and more comprehensive studies.